<p>mixing, rotating and shearing force of the mixing head under the action of self leveling cement is more uniform. Mixing is completed as soon as possible to the mixing of self leveling cement well down on the ground, self leveling cement in windless condition, a toothed scraper to scrape the uniform construction from the inside to the outside, the thickness error of 2 ~ 3mm, at the same time deflated treatment with </p>
<p>release and exhaust barrel, the construction personnel must wear the spikes and improve the strength and quality of self leveling cement. Self leveling cement coagulation time of at least 24 hours, within 10 hours to prohibit people walking around, and close the doors and windows in order to ensure the full flow of self leveling time. 6, when installing a cork floor dry grinding: good self leveling after 5 hours to </p>
<p>close the doors and windows, doors and windows for ventilation to dry open 5 hours, to be dry by grinding machine grinding to remove burrs and the level of self leveling cement surface, in 2 square meters within the scope of the error in 2mm, then suck the dust. Do the roll before. 7, how to do the installation of cork floor glue: give the floor back uniform scraping special rubber floor, parking 3 hours can be </p>
<p>install handrails on concrete steps<br />
how to build composite deck stairs<br />
singapore supplier for gym rubber floor tile</p>
center to the edges of hammering cement
Страница: 1
Сообщений 1 страница 1 из 1
Поделиться108.06.2017 17:37:30
Страница: 1