<p>Cui cover, to avoid the sun and rain. The wooden grid should be laid in the indoor environment is dry conditions. After the completion of the wet work, the ground should be cleaned up. Insulation sound insulation material, such as coke, foam concrete block to dry or dry. The wooden grid nail shop finished, to carefully check whether the sound is required not to carry out the procedure. Two, the cracks in </p>
<p>the floor lax 1) phenomenon of wood floor surface seams lax, seam width greater than 0.3mm. 2) control measures of floor before assembling, should be carefully chosen to have decayed, furuncle scar, splitting and warping flaw should be removed, and the width is not a rabbet overqualification should be repaired again use. With the use of hard wood as a long strip of wood floor slab. Three, the surface is </p>
<p>not smooth 1) corridor and the phenomenon of the room, adjacent to the two rooms or the intersection of the ground floor of the two different materials, as well as the whole room is not level, etc.. 2) prevention measures of wooden grid after laying, the covert acceptance, qualified rear can be laid or gross floor surface layer. Paste the parquet floor base smoothness should meet the requirements. Before </p>
<p>commercial composite floor exterior<br />
where to buy plastic 2x4<br />
wall solid decking exterior faux wood</p>