<P>1. Install the wood floor before the leveling layer must be dry. Otherwise the floor will be a drum, this is very important. General leveling layer to dry at least 20 days or more (to avoid the nest, this period can do other construction), the winter to be longer,fence edging quite high not the eyes to see the surface dry really dry. Self-leveling is not leveling layer, solidification faster, and relatively thin, so the drying period is shorter, about 3 days.</P>
<P>2. Winter water evaporation slow here to provide a simple test method: to find a piece of plastic wrap (not too much), on the plane, with tape sealed around the home is warm friends should be tested in advance whether the heating system is normal Running, conditions permitting to run the geothermal low temperature, wait for more than a day to see if there is a water mark on the ground, if not,composite panel cladding in philippines that has been dry.</P>
<P>3. Floor to 1-3 days ahead of schedule to adapt to the pavement environment. The temperature difference between the various places in winter, so the floor to adapt to the pre-pavement to the environment, or prone to unnecessary deformation. This is very easy to understand,built in compsite deck benches the general manufacturers will be one to two days in advance to meet the room temperature.</P>
<P>4. In particular, we are warm to the district is warm, after the completion of the installation of the floor, do not suddenly open a great warm, must run at low temperature for some time. This is warm,composite wood railings white the floor below the leveling layer and the wood floor has a protective effect!</P>
How does floor dealer get success?
Страница: 1
Сообщений 1 страница 1 из 1
Поделиться130.08.2017 09:22:28
Страница: 1