He told reporters: "first of all, after the floor to the indoor don't opened, the first in the case of closed down for 24 to 48 hours, because this season from outdoor to indoor wpc parquet in varna bulgaria , the environment is a process of from cold to hot, water is the fastest.
Recently, square floor often receive complaints about the floor fracture, actually it's not quality issue, but open caused by premature seal." Many families use to put a basin of water or often open a window in the room to increase the indoor humidity, brinton said that it is improper, indoor water its volatilize quantity is very small plastic product industries in pulau pinang , to improve the indoor humidity is not going to work, but the winter window can let indoor drier.
Keel with moistureproof film "moisture" it is understood that the winter floor not only to "wet", and "moisture". Brinton said that although in the external environment, the shop floor needs humidification, but should pay attention to moisture inside the floor, he told reporters: "because the keel if dry composite boards for building , will be split, so the floor to maintain more than 15% of moisture keel, keel but too tide will affect the floor, so the professional technology of floor laid is need to add a layer between keel and floor moistureproof film to partition the moisture.