<P>Today, in the lotus high-speed Zhuzhou section maintenance construction site, with "highway physician," said the road maintenance car geothermal vitality into a 20-meter-long orange dragon, to 4 to 10 meters per minute speed,Repairs To Asphalt Driveways The uneven pavement is a new look. Road maintenance did not seal road, no traffic jam, the scene did not leave asphalt waste and waste.</P>
<P>It is understood that the local thermal regeneration skills selection of "hot bonding" in the road maintenance construction, waste asphalt pavement materials 100% back to use, more than 2 hours after the opening, environmental protection and efficient. The section of the person in charge of the road, the repair of the 11 km road,strong nursing asphalt road vehicle duration from the previous demand for nearly 3 months to less than 1 month, nearly half of the cut, the skills than the traditional skills increased by 3 times, extend.</P>
<P>The skills identified by the Ministry of Transport to "the world's first" level, in our province's temporary high-speed, Lotus high-speed, high-speed maintenance Tam has been widely used. According to the calculation, only the maintenance of Lotus high-speed, more traditional skills,Silicone Joint Sealing Material construction can reduce the waste asphalt mixture 17280 tons, 10800 tons of new asphalt material savings, reducing emissions of 186 million cubic meters, reducing carbon dioxide emissions 476 tons.</P>