<p>On March 9, the warehouse ditch highway branch organizes the conservation personnel to carry out the special treatment of the salted ice in the section of the Gangxia Xiashan section to prevent the salted ice from posing a threat to the roadbed and bridge and culvert to ensure the safe and smooth road in the mountainous area. March 9,rubblized concrete pavement warehouse ditch highway branch organization of six experienced conservation personnel to G216 line after the mountain section of the mountain, to carry out a period of 5 days of saliva ice road disease special rectification, for the past mountain road vehicles to provide a safe passage environment.</p>
<p>G216 line after the Gap mountain section, about 70 km from the city of Urumqi, every year in March, due to the temperature difference between day and night more than 10 degrees, the snow on the mountain melting,how to make permanent pothole repairs snow into the ditch and pavement, to the night temperature drop on the road Water accumulation of ice water saliva flow, not only to the past vehicles to bring great security risks, but also on the road bridge, culvert threat.</p>
<p>March 9 11 am, conservation personnel in the treatment section to see the snow on the mountain has been slowly melting, the snow to stay on the road to form a layer of thin ice. The wheel pressure over the ice could not slip, the speed of the driver can not grasp the direction of the driver, and the side is nearly 100 meters deep cliff, very dangerous. 12:13, the car after the heroic bridge forward, you can see the mountain by a high about 15 meters wide and 20 meters wide giant "icicle." "Icicles" below the road with a thick layer of ice, ice thickness of 50 cm. At that time,Parking various cariety of series pavement hairdryer a truck passing through here, because the ice is not strong, the wheels crushed thin ice, into them. The driver will car back, change the direction of the throttle, repeated several times before the adventure.</p>