in addition to touch the dry putty will feel sticky hand. 3. Stick wall brick tiles, if rush workers, cut corners, do not meet the proportion of sand and cement mixture, will affect the tile and the wall or the ground adhesion, there will be hollowing phenomenon. You need to gently knock on the surface of the tile can be judged by the sound there is no problem of hollowing there.
4. Live wood products, be sure to do the primer, to prevent the drying during the shutdown cracking. 5. Construction site during the shutdown period, pay attention to the indoor temperature should not be too low, so as to avoid those who are more sensitive to the temperature of the project damage. 6. During the shutdown period,
the owner is best to go to the site, the site to do ventilation, which after the completion of the site after the indoor air quality is certainly beneficial. 80% of the owners do not want to choose cross-Spring Festival decoration for cross-Spring Festival decoration, the reporter on January 10 selected 50 consumers to investigate.
Related links:
outdoor wooden plank use in swimming pools

build playground border landscape timbers

building a deck railing with raised posts