<p>direction, flat-fell seam crevice, staggered joint position, the surface is clean.Oil surface color uniform, smooth, without become warped drum, and skirting board joint close when no empty drum sound.According to specification procedure shop, can achieve quality qualification requirements.??2. The wood floor construction technical main point???The construction project of wood shop is very </p>
<p>professional.Wood floor shop outfit besides according to specification procedure operation, also note the following specific questions:??????(1) all the wood floor to the construction site, should be unpacking indoors for more than a week, to make wooden floor and bedroom to shop after adapt to temperature, humidity.??(2) wooden floor should be done before the shop is selected, excluding has </p>
<p>obvious quality defects of nonconforming product.Will be consistent color decorative pattern shop is in the same room, there was a slight defect quality but does not affect the use, can put in the bottom of the furniture such as bed, cabinet, the thickness of the same room must agree.When buying, should according to the actual pavement area increase the wastage of the 10 a purchase.??(3) the shop installs </p>
<p>veranda railing brazillian walnut<br />
resin picnic table canada<br />
horizontal composite fencing</p>