<p>electrical appliances, air ducts and air conditioning system should be installed in the floor before construction complete; 4, heavy equipment base should be completed, the equipment is installed in the base, the base height should be the same on the floor surface height; 5, the construction site is equipped with 220V/50HZ power supply and water. Two, construction tools for professional cutting saw, laser level meter, level meter, blister tape, ink, suction plate, nut </p>
<p>wrench, screwdriver, vacuum cleaners, broom, mop and so on. Anti static floor construction technology of anti static floor construction process: primary processing and cleaning - &gt; and find the set of square, lattice, positioning elastic line &gt; fixed adjustable bracket and a &gt; the laying of floor surface &gt; cleaning and waxing anti electrostatic floor, a grassroots construction procedure processing and cleaning of floor surface of the frame to be supported </p>
<p>in cast-in-place concrete with cement mortar and terrazzo floor base, base surface should be flat, smooth, no dust, moisture content is less than 8%. Before installation should be carefully cleaned, if necessary, on the surface of the insulation grease or varnish. Two, find, set square, lattice, positioning elastic line according to the room size and plane equipment layout, according to floor plate modulus selection laying direction, specifically the following situations: 1, </p>
<p>outdoor wood effect panels uk<br />
wood deck rubber and floors<br />
recycled materials for parks</p>
construction site is equipped
Страница: 1
Сообщений 1 страница 1 из 1
Поделиться116.04.2017 12:41:03
Страница: 1