<p>introduction of the whole steel floor construction technology for your reference. &amp;nbsp; &amp;nbsp; 1. Floor mounting 1 to measure the area of the building. If not, do not work, and immediately consult with the owners or contractors, indicating that the Department does not conform to the correct. 2 confirm the floor height change in all areas to facilitate the laying of the floor. Can be used for construction level, theodolite or laser level test. At the same time that the </p>
<p>existing fixed structures such as columns, the threshold for the number and the location and the height of the ground to the top. Lift or floor must be in accordance with the characteristics of certain areas, determine the special method to ensure the installation of the floor and the base, so that the floor has a certain degree of suitability for the plane. In the condition that the floor can not be installed horizontally and can not meet all the requirements of the structure, do not </p>
<p>rush to construction, so as not to affect the quality of the project after construction. 3 establish the starting point, according to the test results in the theodolite, draw two vertical datum line with the ink line, to determine the starting position of the flooring. In the cutting edge position, the required cutting floor shall not be less than 15cm, and then the 600X1200mm shall be arranged along the vertical ground wire. 4 installed base, a laser level meter as a benchmark </p>
<p>أوف مقاومة التزيين الخشب للبيع<br />
رغوة المطاط الموردين<br />
شرفة التزيين السعر</p>