<p>inspection and maintenance, it is recommended once a week. step2: furniture into the paved time after the floor finish paving, within 48 hours (usually this period of time to become the floor of the health period), to avoid walking on the floor often and place heavy objects, so that the floor can be firmly glued Give enough time to let the floor dry naturally before moving into the home. Step3: Pavement </p>
<p>requirements After the laying of the pavement environment requirements for the interior, mainly humidity, afraid of the floor fear of damp, so when the indoor humidity �� 40%, should take humidification measures, indoor humidity �� 80%, should be ventilated Wet; to 50% �� relative humidity �� 65% for the best. At the same time to prevent long-term exposure to the sun. Step4: Routine maintenance </p>
<p>requirements have just put the floor must be covered with paper, to avoid the construction of foreign objects or paint drop to the floor. In the door, kitchen, bathroom, balcony mouth mats to avoid water stains, gravel damage to the floor. However, it should be noted that long-term coverage with impermeable materials should not be used. Solid wood and parquet, please use a special floor wax or wood oil </p>
<p>wood or stone panels for indoor walls<br />
privacy backyard deck handrail ideas<br />
recycled compressed plastic outdoor furniture</p>