<p>What is the decoration package? The so-called all-inclusive package refers to the contracted materials, that is, according to the requirements put forward by the users, all the materials are  exterior wooden wall supplioers purchased and constructed by the decoration company. This kind of contracting method is suitable for owners who do not have the time and energy to handle everything. </p> <p>It is not only a kind of decoration method for the owner, but also one of the most  best 2x4 lumber profitable decoration methods for the decoration company. In addition, renovations also include: clean and half-packed. The clearing package is not included in the contractor's work, that is, the materials used for the decoration are the owner's own responsibility, while the decoration company only performs the construction according to the supply materials. This method is suitable for users who have sufficient time and  hollow plastic decking Sri Lanka economic ability.</p> <p> Half bales are the main materials that owners need to use for their own decoration, such as floor tiles, floors, and coatings. The decoration company is responsible for the purchase of construction materials and auxiliary materials. But as to which decoration method to choose, look at the  rubber membrane for decks actual needs of the owners to choose.</p>