Weapon: Into the fall, the weather is getting cold, the air is getting dry. When installing the floor, pay attention to read the manufacturer's installation requirements. First, the floor is installed within the first ten days, watering is prohibited on the ground. Second, after the cement mortar hit the ground flat, ventilated case 30 days after the installation of the floor. This is to ensure that the ground floor humidity meet the installation requirements. At the same time, the moisture content of the floor will be with the air moisture content decreases.
Reduce the moisture content of the floor during the floor due to loss of water and natural shrinkage of the wood fibers, so physical phenomena floors swelling shrinkage is inevitable, a direct result of the moisture content is too low floor cracks and other phenomena. You can use a humidifier, and so give a little wave mop appropriate indoor humidification to reduce wastage floor moisture content.
In addition, the northern autumn sandstorm weather more floors need regular dusting, usually with a broom or vacuum cleaner to remove dust, often stepped on more to be diligent vacuuming. With particular attention to the foyer and hallway leading to the outside, in order to prevent dust into the house, can be placed in the entry of the dust pad.
Related links:
Outdoor Commercial Wood Flooring
Fall floor mounted humidifier big role
Страница: 1
Сообщений 1 страница 1 из 1
Поделиться103.08.2016 14:39:02
Страница: 1