For different types of technology, different team, classify safety education, the implementation of classes before have commented, there are classes in check, class after the summary of the safety management system and team day patrol daily inspection system, safety and technical tests carried out three activities to ensure site every worker to master the basic knowledge of basic safety, operational skills and emergency response techniques.
Increase security investment, the purchase of specialized safety ladder, enclosure panels for construction workers with personal protective equipment, to ensure the safety of the construction site. Project department of production safety leading group to start regular safety inspections twice a month, will eliminate potential safety problems in the bud. Through this series of initiatives, projects always safe and controlled.
Innovative technology, optimize the construction process is also a project to ensure the quality of important aspects. Participation project staff viaduct section all under 45 years old, young, energetic, innovative spirit, just one year in bridge construction, the construction process was optimized, and explore a number of new technologies, new processes.
Such as C50 concrete mix design was optimized using P.042.5 grade cement and fly ash mix design, to ensure the strength of the case, not only reduce the construction costs, but also solve the problem of cracks in high-grade concrete, concrete rebound intensity passing rate of 100%.
<p>Related Sites:<br>
concrete surfacing<br>
filling cracks in basement floor<br>
concrete cutter for sale<br>
crack caulk in basement
</p>